HummelEnergie Systeme GmbH/Aggregatebau + Energietechnik GmbH

The Swabian Aggregatebau + Energietechnik GmbH and the Hummel-Energie Systeme GmbH from Neuss have formed a partnership to jointly present their innovative concepts and products on the bauma. Both companies are specialised in the planning, construction, maintenance and operation of energy production plants. In November 2008, the HummelEnergie Systeme GmbH was the first to connect to the grid with the first baseloadable biogenous cogeneration units. Due to technical innovations in terms of motor and emission control, these units generate 12 MW electrical and 12 MW thermal energy in such a clean and CO2 neutral way that pollutants are virtually untraceable. The cooperation is able to fully customize mobile and stationary power production aggregates according to the demands of the customers. For instance, this could involve a movable power plant, which supplies the power to mobile construction machines. The modular concept of A+E systems also allows for a realization of individual infrastructure solutions. The standardized modular construction system enables the combined and therefore more efficient production of power, heat and cooling energy.

x

Related articles:

Over 415,000 visitors from more than 200 countries

bauma 2010 marks a turnaround for the industry

"The mood in the industry shows that in Europe the bottom of the cycle is now behind us. Confidence has returned. Of course at the start of the fair the exhibitors felt the lack of many customers from...

more
Issue 7/2015

Safe, convenient firing control for industrial thermal processing plant

Elster Kromschröder integrates a wide range of new control and safety functions into the BCU 500 family of burner control units while taking into account current safety requirements and providing...

more
Issue 08/2009

“Phase change materials” integrated in vertically perforated clay units  – innovative passive air-conditioning systems for energy efficient buildings – Abstract

1 Introduction and objectives The fundamental objective of this research project was to ­experimentally determine the temperature-dependent, specific heat capacity of three designated phase change...

more
Issue 8/2015 Prof. Dr.-Ing. Christian Schäffer

Combined kiln-dryer heating systems with thermochemical heat storage

1 Introduction In Zi Brick and Tile Industry International 7/2015, the concept of a brickworks with a “hybrid-ring tunnel kiln” was presented, in which the kiln cooling/dryer combined heating system...

more