Novel burner concept for energy saving
in the tunnel kiln

In process terms, modern tunnel kilns in the brick and tile industry involve two coupled subprocesses that take place in succession.

The first of these consists of a preheating process to maturing temperature, in the second process the bricks are brought in a single- or multi-stage countercurrent cooler to exit temperature. The cooling air heated in this process is removed from the kiln process and used in drying of green bricks.

It is known that preheated combustion air leads to an immediate energy saving in the tunnel kiln. If the temperature of this air is significantly high, there are, however, on account of the expense for insulated pipelines, special fans or fittings, great concerns with regard to pursuing this concept. In addition, because of possibly higher combustion temperatures, there is the danger of producing thermally induced nitrogen oxides. Goal of a joint research project between the Gas-Wärmeinstitut Essen, the Brick and Tile Research Institute Essen Regd, the company Lingl and Bellenberg brickworks was to develop a type of burner that uses the hot cooling air in the kiln and therefore contributes to energy saving without the need for costly additional installations. With the design of the burner nozzle, both the homogenization of the kiln atmosphere and avoidance of increased nitrogen oxide emissions must be ensured. With the help of numerical simulation, the flow inside such burners was optimized before production of the burners began. Tests at both institutes accompanied optimization of the burners before they were installed and tested in a real tunnel kiln. The results are presented in the talk.

Dipl.-Ing. Eckhard Rimpel, Institut für Ziegelforschung Essen e.V.

x

Related articles:

Issue 03/2021

Optimizing the preheating zone in a tunnel kiln

The rebuild project at the brickworks Ziegelwerk Bellenberg Wiest has a history that began more than ten years ago. The brickworks has been a Keratek client for many years, though “with brickworks,...

more
Issue 02/2010

Concepts for reducing the loss of exhaust air from dryers in the clay brick and tile industry

1 Initial situation and problem description More than half of the energy used in the production of clay bricks and tiles is currently used for drying green bricks and tiles. The hot air needed for...

more
Issue 10/2010 Dr. Andreas Immenkamp

Reconstruction of the Roman military brick kiln excavated in Dormagen – experimental archaeology at the Lage Brickworks of the LWL Museum of Industry

1 Objective The objective of this project was to contribute to research into Roman firing techniques. For the first time a kiln was to be reconstructed on 1:1 scale and put into operation. The project...

more
Issue 01/2024

Climate-neutral firing process 4.0. in the brick and tile industry

Introduction The brick and tile industry has been under enormous pressure to make changes for some time now. The legislator has stipulated greenhouse gas neutrality by 2045 in the Climate Protection...

more
Issue 1-2/2012

New tunnel kiln with energy-saving high-efficiency burner system for ­Indonesian plant in Surabaya

In 2008, Pabrik Genteng Keramik “Good Year” in Surabaya, Indonesia, decided to build a tunnel kiln in cooperation with Keller HCW GmbH. Pabrik Genteng Keramik, a medium-sized enterprise, has been...

more