Wienerberger take-over of Reetz clay block plant from Röben

As of 1 September 2017, Wienerberger AG took over the Reetz clay block plant from Röben Klinkerwerke GmbH in Germany.

“For us, increasing our production capacities for high-quality clay blocks filled with mineral wool is an important step to optimally serve the market. We are also delighted to be able to take over a plant such as the Reetz facility that especially thanks to its innovation fits in so well with Wienerberger’s corporate culture. Reetz has a motivated team – together we shall continue to successfully push ahead with business”, says Lorenz Bieringer, Managing Director of Wienerberger’s business unit for wall products and spokesman for the management.

190 mill. NF at the Reetz plant

The plant is located around 100 kilometres south-west of Berlin. With about 45 employees, it produces high-quality blocks with an annual production capacity of 190 mill. NF. The product range comprises high-quality clay blocks filled with mineral wool and unfilled blocks as well as high-precision clay blocks. The main markets supplied by the plant are regions in the eastern part of Germany and in the west of Poland. The facility is also equipped with an efficient photovoltaic installation to generate its own electricity.

Currently, Wienerberger produces clay blocks at nine production sites in Germany; filled blocks are produced at two of these plants. The takeover will shift the emphasis to higher-quality products. Wienerberger intends to use the Reetz facility to obtain a better market presence for clay blocks as a building material.

Currently, Wienerberger operates 18 plants in Germany. These include ten plants for clay blocks, three plants for facing bricks and clay pavers, four roofing tile plants and a facility for ceramic facade tiles. Wienerberger employs a labour force of about 1 450 employees in Germany.

Wienerberger GmbH
www.wienerberger.de

x

Related articles:

Wienerberger take-over of Reetz clay block plant from Röben

As of 1 September 2017, Wienerberger AG is taking over the Reetz clay block plant from Röben Klinkerwerke GmbH in Germany. “For us, increasing our production capacities for high-quality clay blocks...

more
Issue 04/2024

Production at Wienerberger‘s Reetz plant in Germany comes to a long-term halt

As first reported by the Märkische Allgemeine Zeitung (MAZ) on 7 June 2024, Wienerberger will no longer be producing bricks at the Reetz clay block plant in Wiesenburg/Mark in the medium term....

more
Issue 12/2013 Keller HCW supplies filling plant for Wienerberger facility in Haiding

Filled clay blocks – an unstoppable trend

Since summer this year, Wienerberger has been producing clay blocks filled with mineral wool inserts, thermo blocks for short, on a plant installed by Keller HCW in Austria too. The long-established...

more
Issue 1/2017

Wienerberger: Fired clay from cellar to roof

For the construction of private detached homes, the perlite-filled high-performance Poroton-T7-P clay block in the wall thickness 49 cm offers efficiency and passive house standard. The virtually...

more
Sustainable wall building materials on the advance

Every second Poroton exterior wall clay block now filled

In 2012 the members of Deutsche Poroton that manufacture clay blocks were able to increase the percentage of filled clay blocks to 16% (2.3 mill. m3) of the total sales of the Association. In the...

more