Diapason Premium – the new integrated control and supervision software package

In an industrial environment where operating and ­financial performance issues are becoming increasingly strategic, Ceric is launching an innovative and highly efficient product on the market: Diapason Premium. Its various modules enable a new vision of a heavy clay manufacturing plant and contribute to achieving optimum efficiency of industrial facilities in all its aspects.

1 Introduction

In 2012, the Belgian group Etex commissioned Ceric to build a Casing kiln for its Kos‘ cian plant (Poland). The brickworks was built on a greenfield site with a production capacity of 30 mill. large-size roofing tiles (10 tiles/m2), which are fired on H-setters. Following the successful realization of this project, roofing tiles and accessories can be fired with excellent quality and very low energy consumption. With a channel width of over 10 m, this Casing kiln is the largest ever built by Ceric. This kiln includes the latest equipment developed by Ceric Technologies such as...

Related articles:

Issue 6/2012

Ceric Technologies designs a supersized tunnel kiln for a Polish roofing tile plant

For its new Koscian facility, which will produce 30 mill. large-size clay roofing tiles (10 tiles/m2) and related accessories, the Belgian Etex Group has decided to entrust Ceric Technologies with the...

more
Issue 03/2013 Ceric Technologies

Clean energy and lower consumption

Energy is now the primary focus of the research efforts made by Ceric Technologies with the aim of developing new technologies for the clay brick and tile industry. These research activities cover...

more
Issue 05/2012 Roller dryers for roof tiles

Sacmi supplies new plant for Creaton/Etex in Poland

Rapid on-roller drying of extruded ceramic products with a moisture content of 16–20% was first introduced onto the market by Sacmi in the 1990s. This need arose as a result of increases in the...

more
Issue 1-2/2012 Fapro, Oran (Algeria)

Fapro’s brick plant doubles its production capacity

1 Introduction The construction market in Algeria is booming. The entire heavy clay production is consumed by the domestic market. In accordance with the Five-Year Plan (2010?–?2014), more than one...

more
Issue 03/2010

Thermoplan kiln controls for a Ceric kiln at Creaton AG in Roggden

For over ten years a dryer control system and an operational data logging system from Thermoplan have already been in operation at the Roggden plant. In addition, systems to control the dimensional...

more