Keller HCW wins major order from Saudi Ceramics Company

The Saudi Arabian company Saudi Ceramics Company has ordered an ultramodern production plant for horizontally perforated bricks, ceiling bricks and common bricks with preparation and shaping machinery and kiln, dryer and production technology from Keller HCW.

For Saudi Ceramics the criteria for placing this order were the low energy consumption for dryer, kiln and machinery, efficient personnel management, and highest flexibility and quality for the future products.

The new brick factory, which will be built in the vicinity of the Saudi Arabian capital Riyadh, is designed for a daily output of 1 000 t per day and, with its sophisticated plant design, it is fully prepared for future market developments in the Arab world.

x

Related articles:

Issue 1-2/2011

Energy-efficient drying of bricks with the “Paraflow” dryer from Keller HCW

Since the beginning of the 1990s, Keller HCW has been successfully using Ecorapid dryers. The name is a composition of Economic und Rapid, thus meaning economic rapid drying. In times of exploding...

more
Issue 04/2012

Siberian Brick Factory built by Keller HCW operates at –34° C

Novosibirsk is not only the economic and cultural centre of Siberia, but with almost 3 mill. inhabitants it is also the third largest city in Russia. Recent years have been characterized by booming...

more
Issue 7-8/2010

Keller HCW dedicates new tunnel kiln in Indonesia

On June 16, 2010, a very special good luck symbol was unveiled at the Pabrik Genteng “GOOD YEAR” brick plant in Surabaya, Indonesia. Very much to the joy of brick-plant owner Halim Hartono, a huge...

more
Issue 6/2018 Ibstock, Leicestershire, UK

Ultra-modern facing brick plant for Ibstock

1 Introduction Bricks have been produced in Ibstock since the 1830s. Since then, the site has continued to develop sustainably with “innovation based on tradition”. In October 2015, Ibstock was...

more
Issue 3/2018

Keller HCW successfully hands over brick plant in Al-Khumra, Saudi Arabia, to the customer

On 25 September 2014, the largest order in Keller’s history was signed. Plants I and II were successfully approved by and handed over to the customer El Khayyat in mid-March 2018. With this, the two...

more